This program is an add-on to the ACCPAC Plus
Order Entry system. A menu choice called "Process Job Costing
Data" is added to the Order Entry menu.
When you post invoices in O/E with job
related detail lines, the program passes that information into
Job Costing and Accounts Receivable.
How Does it Work?
The "Process Job Costing Data"
program is run after the O/E Day End Process is performed. The
program checks all invoices posted since the last time the
Link program was run by reading the Invoice/ Credit Note Audit
List. The Link creates a Job Costing billings batch and allows
billing to the job-phase levels. The Link installation program
has also adjusted A/R Invoice Posting program to no longer
create the J/C billings batch because it is now done directly.
How does the program know what job and
phase the invoice lines refer to?
The job number being billed must be the same
as the O/E order number being invoiced. If the order number is
5000, then the job being billed is 5000. The order can be
added to and invoiced as many times as you want. The job can
be defined in Job Costing before or after the order number is
entered.
Each item detail line on the invoice has a
category code from Inventory Control. Special category codes
that begin with a "J" are defined to signify a job related
detail. By entering a category code "JE1" on the detail line,
the program treats this as a job related detail and bills it
to phase "E1" in J/C. Items in inventory can be setup as
non-stocked items to be used in job related invoices.
The program does not change O/E programs in
any way.
What is required for the O/E Link?
The Link requires Job Costing 6.1A and O/E
6.1B
- Select to order product or
information.